Projects
Water Status Study - Scope I JSW Tarapur Works
Water Status Study - Scope I for JSW Steel Coated Products Ltd Tarapur Works
Project Description
The scope of work under this project includes;
1 Measure water consumption – direct or real
2 Maximize (operational efficiency) through 3M7R approach.
3 Define direct/ real water resource offset.
4 Map and delineate plant’s watershed.
5 Measure quality of operational water use and treated wastewater used for disposal to ecosystem
6 Measure quality of receiving ecosystem and compare with treated wastewater quality from the plant.
7 Compare quality of receiving ecosystem regarding its designated best use and define water quality offset
|
Download CII App:
|